The typical floor build-up that we find is the installation of insulation as required OVER the concrete sub-floor, which is covered with a 500 gauge plastic membrane. An expansion joint is installed around the perimeter of each room, on both internal and external walls. The underfloor heating pipes are then clipped in, if being installed, all before being covered by Easy Screed.