When using Easy Screed as a thin, levelling screed, why is a primer or plastic needed?

Preparation of the sub-floor is required to de-bond the Easy Screed from existing, generally cement-based sub-floors. Direct contact with cemetitous floors can cause the cracking in the sub-floor to carry-through to the Easy Screed, therefore it is best practice to debond the screed.

April 15th, 2017 by